Ground screw mounting solution

CG601 CM Solar Ground screw mounting solution

ADVANTAGES OF GROUND SCREW
 
Simple and fast installation No precast foundation base no onsite welding or fabrication as required in other solutions like piles which allows a significant cost reduction. Only a Spiral Piling Machine is needed to dig and drill. Typically 100-200 screws can be installed per day per machine in a medium stiff soil. 
 
Suitable for all types of soil Ground screw is the fast and cost effective solution to ground mounting system in all known geologies from loose soil to bedrock sand marsh and slopes up to 30 degrees.
 
Compatible with all type of mount structures The head of ground screw can be adapted to whatever the customer’s need is.
 
Environmentally friendly Without performing and preparation works the surrounding areas remains unspoiled。 Besides without corruption and zero disposal costs the screw is totally recyclable complying with the environmental protection concept. 
 
Easy and quick relocation High possibility of removing them reducing the environmental impact and minimizing the removing costs. 
 

Installation Site: Open field
 
Tilt Angle: According to customer’s feasibility study
 
Applicable Module: Silicon / thin-film module
 
Material: Q235B & AL6063T5
 
Surface Treatment: Hot-dip galvanizing & anodizing
 
Wind Load: 130km / h
 
Snow Load: 0.5kN / m²
 

If you are interested in our products
please feel free to send an e-mail to info@cmsolarcn.com
Or call us: +86 512 83561606

RFQ-CHECK LIST FOR GROUND MOUNTING SOLUTION

Thank you for selecting CM Solar. Please complete this form and send it by Mail to info@cmsolarcn.com

PROJECT INFORMATION
Your name is required.
Project is required.
Altitude is required.
Location is required.
Street/No. is required.
Postcode/City is required.
Country is required.
Tel.NO. is required.
Topographic situation
Panels Features
Panel is required.
Weight is required.
kg
Nominal output is required.
Wp
Overall performance is required.
MW
Dimensions is required.
mm
Total number is required.
pcs
DESIGN CONDITION
Design code is required.
Wind Speed is required.
m/s
Structure pitch is required.
°
Snow load is required.
kn/m²
Module layout is required.
Minimum Ground Clearance is required.
mm
CORROSION

Atmospheric Corrosion Category(ISO9223):

FOUNDATION SELECTION
Embedment Depth is required.

mm

(a)
(b)
(c)
(c)
OTHER INFORMATION